---
title: "Earthquake business disruption planner | NZ Business Alliance"
description: "Explore Alpine Fault disruption scenarios, estimate cash needed during a closure and print a practical business continuity checklist."
source: https://alliance.org.nz/tools/earthquake-business-planner/
---

Business resilience / Free planning tool

# If trading stops,
_what keeps you going?_

Explore earthquake disruption, test your cash buffer and leave with a practical checklist for your business.

Start your cash plan

## Plan around disruption,
not just damage.

Your premises could be usable while a blocked road, power outage or unavailable supplier interrupts trading.

AF8’s planning scenario describes a magnitude 8.2 earthquake with a rupture longer than 400 km. It is one credible scenario for preparedness, not a prediction for a particular town or business.

[Read the AF8 scenario](https://www.af8.org.nz/af8-scenario) · [Understand the science](https://alliance.org.nz/data/alpine-fault/)

## Five dependencies to think through

The national infrastructure assessment identifies cascading disruption across lifelines. Use these prompts to examine your own business.
Transport and deliveries

Landslides and damaged routes can interrupt access, deliveries and freight. Identify which products depend on a single route, how long existing stock could last, and who can supply alternatives.
Power and water

Consider the work that stops without electricity or water: refrigeration, machinery, sanitation and charging. List essential loads and discuss safe backup arrangements with qualified providers.
Communications and payments

Plan for losing mobile coverage, internet, cloud access or payment terminals. Keep essential contact information offline and agree a backup way to share updates.
People and premises

Staff may be caring for whānau or unable to travel. Identify critical roles and deputies, remote work options, and how you will confirm safe access to your premises.
Customers and suppliers

A customer or supplier outside your region may still depend on disrupted transport or services. Map your most important dependencies and agree how to prioritise orders.

Context: [NZ Infrastructure Vulnerability Assessment (2023), Alpine Fault case study](https://www.civildefence.govt.nz/assets/Uploads/documents/lifelines/NVA-Part-C-Sectors-and-Hazards-v1.0-Sept-2023.pdf). Business prompts are Alliance’s adaptation, not local outage forecasts.

Your assumptions / NZ dollars

## How much cash would you need?

Choose a closure period and enter the cash costs that would continue. Example values are prefilled; replace them with your own.

Your cash plan

### For a 14-day closure

Enter valid figures to calculate your plan. JavaScript is required.

This estimate assumes monthly amounts spread evenly across 30 days and extra costs paid immediately. Bill due dates can create a larger cash shortfall.

How the calculation works

## A plan you can take away

Tick what you already have in place. Add the next action, who owns it and a review date. Your entries stay in this page until you download or print them; reloading clears them.
Business namePlan ownerReview date
Keep an offline staff contact list and agree how to check in.Agree how to confirm premises are safe before anyone returns.Identify an alternative for each critical supplier or delivery route.Plan how essential work would continue without mains power or internet.Test restoring a backup and accessing essential records away from the premises.Agree how to take orders, invoice and communicate with customers during an outage.Review cover, exclusions, waiting periods and claim records with your insurer.Assign owners to the next actions and set a date to practise the plan.
Our next actions and owners

No account required. Calculator and checklist entries are not submitted to Alliance.

## How the calculation works

**Cash required** = extra costs at the start + any positive gap between continuing costs and receipts over the closure. Monthly amounts are divided by 30, then multiplied by the selected days. Receipts above continuing costs do not offset an upfront payment.

**Additional cash needed** = cash required minus available cash, with a minimum of zero. Cash runway is calculated after the upfront payment, assuming costs and receipts stay constant.

Enter cash amounts consistently, including any GST or tax payments that actually fall due. This is a simple planning estimate, not a valuation of earthquake losses or an insurance payout. It excludes repair costs unless you enter them, sales recovery after reopening, interest changes and the timing of individual bills.

## People first. Continuity next.

Keep your immediate workplace emergency response plan separate from your business recovery plan. Agree staff safety, accessibility and evacuation arrangements, and practise them.

[Get Ready: workplace emergency planning](https://getready.govt.nz/prepared/work)

## Keep building your plan

[Business.govt.nz business continuity planning guide](https://www.business.govt.nz/browse-our-resource-library/business-continuity-planning-workshop/business-continuity-planning-guide) · [AF8 scenario](https://www.af8.org.nz/af8-scenario) · [NEMA workplace earthquake guidance](https://www.civildefence.govt.nz/guidance-training/consistent-messages/earthquake/readiness-get-prepared-to-respond-to-earthquakes).

Reviewed 26 November 2026. Scenario context is sourced above. Closure periods, costs and receipts are your inputs; the tool does not estimate earthquake probability, building safety or local recovery times.
